Sawchuk: Since 1981 building excellence

Southwind at Sarsons, Kelowna BC

  Constructed for an environmentally friendly developer, Southwind at Sarsons Phases I and II were completed over a period of five years. The development to date consists of two buildings containing 81 Condominiums, 2 Loft Suites, 9 Penthouses, 15 Townhomes and a Residents Club comprised of a gym, pool, hot tub, change rooms and lounge. The entire project is heated and cooled by a 100% geothermal system including the pool and spa.

With a consolidated parkade of over an acre and a half and a finished area of close to 200,000 ft2, this is one of the largest residential projects weve had the pleasure of constructing. High end finishes include sculptured carpet, cork, travertine, granite, quartz, hardwood and concrete fireplace surrounds. Some of the ensuite amenities include body sprays, steamer units, chromatherapy and even speakers in select showers. One suite even has an infinity edge tub installed which is filled from the ceiling.

The final Phase of Southwind has yet to move into design drawings, but we anticipate another cutting edge building when it does.

Client:   Green Projects
 

[back to Past Projects]



Site Design & Programming:  C.D. Cote, Programming